MVME177-012控制卡件
这必须包括腐蚀和腐蚀磨损的测量以及电偶腐蚀、晶间腐蚀、应力腐蚀开裂、设备腐蚀、点蚀、蜂窝状腐蚀的评估,以及材料不相容性的检查;目视检查储罐内表面和难以触及的腐蚀或故障区域;以及检查内部和外部衬里、覆层和涂层是否有任何故障迹象,如裂缝、气泡、气泡、剥落、卷曲或分离。 未经检查的设施。如果储罐系统的任何部分未按要求进行检查,则所有者或操作员必须根据本部分第598.10节的要求将未经检查的系统部分停止使用。598.8记录保存。记录保存。本部分第598.6节和第598.7节要求的每个月、年或五年试验或检查的报告必须与防泄漏报告一起保存,并应要求保存并提供给部门。年度检查记录必须保存五年。其他检查或测试的报告必须保存10年。日常检查无需记录。 报告。所有报告必须包括以下信息:设施注册号; 测试或检查的储罐、管道或设备的识别号;测试或检验日期;测试和检查结果,包括管道、储罐和辅助设备状况、预期使用寿命和维修需求报告;6 NYCRR第598部分–2015年10月11日第18页使用的测试和检查方法;工程师或技术人员的证明,证明测试或检验已按照本部分要求进行; 工程师或技术人员资格声明; 工程师或技术人员的姓名;工程师或技术人员的营业地址;以及工程师或技术人员的签名。598.9设施的维护和维修。维修。 必须立即采取行动,防止即将释放。如果任何检查表明继续操作或实践将导致泄漏,或储罐系统或其任何部分不充分或不严密,则必须修改或停止操作或实践。必须立即更换、修理或停止使用储罐系统或其任何部分。可能表明即将发生泄漏的示例包括但不限于:泄漏的阀门、泵和管道接头、故障的压力或真空释放装置、不适当的仪表、密封性试验失败、储罐外壳过度变薄(这表明储罐填充时存在结构缺陷)以及故障的压力计或温度计。
This must include measurement of corrosion and corrosion wear, evaluation of galvanic corrosion, intergranular corrosion, stress corrosion cracking, equipment corrosion, pitting corrosion, honeycomb corrosion, and inspection of material incompatibility; Visually inspect the internal surface of the tank and the corrosion or fault areas that are difficult to reach; And inspect the internal and external linings, coatings and coatings for any signs of failure, such as cracks, bubbles, bubbles, peeling, curling or separation. Uninspected facilities. If any part of the tank system is not inspected as required, the owner or operator must remove the uninspected part of the system from service in accordance with section 598.10 of this part. 598.8 Record keeping. Record keeping. The monthly, annual or five-year test or inspection report required by 598.6 and 598.7 of this part must be kept together with the leakage prevention report, and kept and provided to the department upon request. Annual inspection records must be kept for five years. Reports of other inspections or tests must be kept for 10 years. Daily inspection does not need to be recorded. report All reports must include the following information: facility registration number; Identification number of the tank, pipeline or equipment tested or inspected; Date of test or inspection; Test and inspection results, including reports on the condition, expected service life and maintenance requirements of pipelines, tanks and auxiliary equipment; 6 Test and inspection methods used in NYCRR Part 598 – Page 18 of October 11, 2015; The engineer or technician's certificate that the test or inspection has been conducted in accordance with the requirements of this part; Qualification statement of engineers or technicians; Name of engineer or technician; Business address of engineers or technicians; And the signature of the engineer or technician. 598.9 Maintenance and repair of facilities. repair. Immediate action must be taken to prevent imminent release. If any inspection shows that continued operation or practice will lead to leakage, or the tank system or any part thereof is inadequate or not tight, the operation or practice must be modified or stopped. The tank system or any part of it must be replaced, repaired or taken out of service immediately. Examples that may indicate an impending leak include, but are not limited to, leaking valves, pump and pipe connections, faulty pressure or vacuum relief devices, improper instrumentation, failure of the leak tightness test, excessive thinning of the tank shell (which indicates a structural defect when the tank is filled), and faulty pressure gauges or thermometers.