UNS0869a-P 3BHB001337R0002 工控备件模块
重要信息自动化
向承运人交付设备视为向买方交付。承运人对运输过程中发生的任何损坏负责。如果发现损坏买方有责任通知相关方。如果买方未能遵守这些步骤则买方将丧失任何赔偿损失或损害的权利。自动化出版物年月 预充电模块开箱和吊装说明安装说明阅读吊装注意事项在尝试提升预充电组件之前阅读这些注意事项。模块重量所有起重设备必须支持这些近似最大的预充电模块重量。提起模块按照以下步骤提起模块。将适当的硬件插入并固定在指定的起吊孔中如图所示。注意:用于提升模块的所有设备和硬件必须具有适当的尺寸和额定值以安全地提升和保持模块的重量。为防止可能的人身伤害或设备损坏:•提升模块前检查所有硬件是否正确连接。•不允许模块或提升设备的任何部分接触带电导体或部件。
运输过程
中请勿使模块高速加速或减速。•在提升过程中不得让人员或其四肢直接位于模块下方。模块类别。编号:近似最大重量。▸Ö预充电模块目录号尺寸单位为毫米和自动化出版物年月 预充电模块开箱和吊装说明安装说明。缓慢地将模块提升至直立位置并小心地将模块运输至安装位置。附加资源这些文件包含自动化公司相关产品的附加信息。您可以在上查看或下载出版物。重要信息:当接近完全直立垂直位置时重量可能会移动导致模块意外摆动。控制模块从运输集装箱中升起时的移动。资源描述 开放式套件技术数据出版物提供以下详细信息:•套件选择•套件额定值和规格•选项规格 开放式工具包安装说明出版物提供在用户提供的机柜中安装开放型套件的说明。
Automation of important information
Delivery of the Equipment to the Carrier shall be deemed to be delivery to the Purchaser. The carrier shall be responsible for any damage occurring in the course of transportation. If damage is found, the Buyer shall be responsible for notifying the relevant parties. If the Buyer fails to follow these steps, the Buyer will lose any right to compensate for the loss or damage. Automation Publications Month Precharge Module Unpacking and Lifting Instructions Installation Instructions Read lifting precautions Read these precautions before attempting to lift the precharge module. Module weight All lifting equipment must support these approximately maximum precharged module weights. Lifting the module Follow the steps below to lift the module. Insert and secure the appropriate hardware into the designated lifting holes as shown. Note: All equipment and hardware used to lift the module must be of appropriate size and rating to safely lift and maintain the weight of the module. To prevent possible personal injury or equipment damage: • Check that all hardware is properly connected before lifting the module. • Do not allow any part of the module or lifting equipment to contact live conductors or parts.
Transportation process
Do not accelerate or decelerate the module at high speed. • Personnel or their limbs shall not be directly under the module during lifting. Module category. No.: Approximate maximum weight. ▸ÖÖÖÖ▸ÖÖÖÖÖ The size unit is mm and the automation publication is month/month Pre charging module unpacking and hoisting instructions Installation instructions. Slowly lift the module to the upright position and carefully transport the module to the installation position. Additional Resources These files contain additional information about the automation company's products. You can view or download publications on. Important: When approaching the fully upright vertical position, the weight may move, causing the module to swing unexpectedly. Controls the movement of the module when it is raised from the shipping container. Resource Description Open Kit Technical Data Publications provide the following details: • Kit Selection • Kit Ratings and Specifications • Option Specifications Open Kit Installation Instructions Publications provide instructions for installing open kits in user supplied cabinets.