PM866A-2 3BSE081230R1工控机器人备件
接触器断电时断开
常开辅助触点设计为在接触器断电时断开。N.C.辅助触点设计为在接触器断电时闭合。在位置P1的接触器上提供一个常开辅助触点组件,用于直流驱动模块启用功能。附加辅助触点组件可安装在位置P2、P3和P4接触器中。56和110安培接触器的位置将取决于可安装在正向和反向接触器之间的空置P2和P3位置的触点组件的类型。安装1.关闭驱动断路器并断开机柜电源。2.对齐触点背面的箭头并定位凸耳。3.首先将辅助触点(凸耳)插入接触器侧面的适当位置。推动,将触点锁定到位。4.选择所需的端子并连接相应的导线。
更换
1.关闭驱动断路器并断开机柜电源。2.松开线圈盖并直接拉出辅助触点!注意:打开并锁定主电源断路器和所有其他电源断路器,以避免意外启动受控设备造成电击或伤害的危险。出版物1370-IN011B-EN-P 6 1370直流回路接触器和接线片套件接线片套件1370接线片套件提供了所需接线片,以终止1370直流环路接触器上的导线。当正确安装时,接线片将提供一个安全且耐气体的终端。吊耳套件包括(2)个DB吊耳和(4)个电枢线和负载吊耳。要安装凸耳,需要使用型号为TBM6或TBM6S的Thomas&Betts Corporation压缩工具。
Disconnect when the contactor is powered off
Normally open auxiliary contacts are designed to open when the contactor is de energized. N. C. Auxiliary contacts are designed to close when the contactor is de energized. A normally open auxiliary contact assembly is provided on the contactor in position P1 for the DC drive module enable function. Additional auxiliary contact assemblies can be installed in contacts P2, P3, and P4. The location of the 56 and 110 amp contactors will depend on the type of contact assembly that can be installed in the vacant P2 and P3 positions between the forward and reverse contactors. Install 1. Close the drive circuit breaker and disconnect the cabinet power. 2. Align the arrow on the back of the contact and locate the lug. 3. First insert the auxiliary contact (lug) into the proper position on the side of the contactor. Push to lock the contact in place. 4. Select the required terminals and connect the corresponding wires.
replace
1. Close the drive circuit breaker and disconnect the power supply of the cabinet. 2. Loosen the coil cover and pull out the auxiliary contact directly! Note: Open and lock the main power circuit breaker and all other power circuit breakers to avoid the risk of electric shock or injury caused by accidental startup of controlled equipment. Publication 1370-IN011B-EN-P 6 1370 DC Loop Contactor and Lug Kit Lug Kit 1370 Lug Kit provides the required lugs to terminate the wires on the 1370 DC Loop Contactor. When properly installed, the lug will provide a safe and gas resistant terminal. The lifting lug kit includes (2) DB lifting lugs and (4) armature wire and load lifting lugs. To install the lug, Thomas&Betts Corporation compression tool TBM6 or TBM6S is required.